Arkora Hydro's Kukusan 2 site is a run-of-river hydro power plant located in the provinceof Lampung. Construction has began in Q2 of 2022 and will be commercially operational by 2025. The installed capacity of the plant is 5,4 MW with an estimated annual energy output of 35,024 MWh.
Capacity
5,4 MW
Status
Construction Preparation
Location
Lampung
Net Head
124.6 meter
Turbine Type
Francis Turbine
Turbine Manufacture
Tba